|
|
|
EH2FC
INTEGRATED HYDROGEN CYCLEEquipment composed by: PEM Electrolyzer, Gas Storage Unit, H2/O2 Flow Control System, and PEM Fuel Cell.
|
|
|
|
|
|
PS10W
PHOTO-VOLTAIC CONVERSION EQUIPMENTSystem integrated by a dual illumination unit (100 W / 500 W), a polycrystaline photovoltaic panel and an energy converting switching power supply.
|
|
|
|
|
|
WT12P
WIND TUNNEL FOR EOLIC GENERATORSWind tunnel for electric generation simulation, with axial fan (regulated speed), air velocity measurement instrumentation and wind generator to be tested.
|
|
|
|
|
|
WG04K
WIND GENERATOR WITH DATA ACQUISITION SYSTEMReal wind generator with mounting structure, environmental parameter instrumentation and data acquisition system.
|
|
|
|
|
|
TSPP1
THERMO-SOLAR DEMONSTRATION UNITThermo-solar demonstration unit with interchangeable flat and parabolic collectors.Including an energy balance system.
|
|
|
|
|
|
TEG8W
PELTIER EFFECT THERMO-GENERATION EQUIPMENTThermo-generation equipment integrated by temperature control unit, a quadruple Peltier Effect generation block and a final stage for electricenergy measurement.
|
|
|
|
|
|
RME5C
ALCOHOLS CATALYTIC REFORMING EQUIPMENTChemical hydrogen production system by alcohol reforming (Methanol or Ethanol).With reactant dosing unit, catalytic reactor and final product separation.
|
|
|
|
|
|
BBGL1
LABORATORY BIO-GAS GENERATION EQUIPMENTSmall scale Bio-Gas production equipment.With raw material preparation vessel, dual stage fermenter and bio-gas accumulator.
|
|
|
|
|
|
BBG35
PILOT PLANT FOR BIO-GAS GENERATIONComplete semi-automatic (with PLC and HMI) pilot plant for bio-gas process asessment.With preparation tank, hydrolizer, fermenter, solids separation, bio-gas washing and storage.
|
|
|
|
|